Lock-Out Tag-Out - Bravo 8105 Installation Manual

Convection reflow system
Table of Contents

Advertisement

Section C:

Lock-Out Tag-Out

. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . .
Overview
Introduction
Safety
In this Section
2-9317-370-00-0
Be sure to perform Lock-Out Tag-Out steps before beginning maintenance,
installation, or upgrade procedures. Since lock-out tag-out procedures and
policies vary from company to company, the information here is provided as a
recommended guideline. Each company must establish their own specific policies
and procedures.
To minimize system down time and ensure staff safety, observe the following:
ATTENTION
If procedures must continue past the shift of the person who applied the lockout
device, ensure that an employee who is working the next shift applies their
lockout device and the previous person removes the initial lockout device.
Refer to the following lock-out tag-out procedures:
Attach Facility Lock-Out Tag-Out Device
Attach Machine Lock-Out Tag-Out Device
Perform Required Task
Remove Lock-Out Tag Out Devices
Bravo™ 8105 Installation Guide
Topic
S A F E T Y I N F O R M A T I O N
Overview
See Page
1 – 14
1 – 15
1 – 16
1 – 17
1-13

Advertisement

Table of Contents
loading

Related Products for Bravo 8105

Table of Contents