Preliminary Checks; Programming The Boiler - Beretta EXCLUSIVE C Installer And User Manual

Hide thumbs Also See for EXCLUSIVE C:
Table of Contents

Advertisement

Available languages

Available languages

EXCLUSIVE
4.1
Access to the technical parameters
Through the REC10 it is possible to access, using the TECHNICAL menu,
a series of parameters that can be programmed to allow you to personalise
the operation of the boiler:
- select MENU on the initial page of the REC10 and press the key
FRI
FRI
18/05/2013
MENU
MENU
30
INFO
INFO
HOT WATER TEMPERATURE
HOT WATER TEMPERATURE
- keep the keys
and
password menu (about 5 sec)
FRI
FRI
18/11/2013
SELECT OPTION
SELECT OPTION
- using the keys
and
access the INSTALLER or SERVICE authorisation level, depending on
the level of the tree menu, then press the key
INSERT PASSWORD
INSERT PASSWORD
- select TECHNICAL with the keys
selection with the key
SELECT OPTION
SELECT OPTION
- access the desired menu and change/view the parameter concerned
(see the menu tree on page 8).
It is possible to return to the start page at any time by keeping the key
"back" pressed for at least 2 seconds.
20
PLANT
PLANT
12:17
1.3 bar
STATE
STATE
°C
.3
SET
SET
pressed at the same time to enter the
MENU
MENU
12:17
SETTINGS
SETTINGS
select the value of the password to
00
and
, confirming the
MENU
MENU
SETTINGS
SETTINGS
TECHNICAL
TECHNICAL
5
COMMISSIONING
5.1

Preliminary checks

First ignition is carried out by competent personnel from an authorised
Technical Assistance Service Beretta.
Before starting up the boiler, check:
- that the data of the supply networks (electricity, water, gas) correspond
to the label data
- that the extraction pipes of the flue gases and the air suction pipes are
working correctly
- that conditions for regular maintenance are guaranteed if the boiler is
placed inside or between items of furniture
- the seal of the fuel adduction system
- that the fuel flow rate corresponds to values required by the boiler
- that the fuel supply system is sized to provide the correct flow rate to
the boiler, and that it has all the safety and control devices required by
current regulations
- that the circulator rotates freely because, especially after long periods of
inactivity, deposits and/or debris can prevent free rotation.
Eventual releasing of the circulator shaft
- Insert a screwdriver in the hole (1) of the circulator.
- Press (a) and turn the n° 2 Phillips screwdriver (b) until the release of
the crankshaft.
Perform this operation with extreme caution to avoid damaging the
components.
5.2

Programming the boiler

- Position the system's master switch to the "on" position.
- If necessary set the TIME and DATE setting the HOURS, MINUTES,
DAY, MONTH and YEAR with the keys "up" and "down", confirming
the selection.
ENTER TIME AND DATE
ENTER TIME AND DATE
12
18 / 11 / 2013
USE THE ARROWS TO MODIFY
USE THE ARROWS TO MODIFY
-
Note: it is possible to change the TIME and DATE settings, as well as
LANGUAGE and the duration of the back-lighting, also later by entering
the MENU from the main screen and then selecting SETTINGS.
b
Each time that the boiler is powered an automatic venting cycle is
carried out lasting 2 min. To interrupt the vent cycle, carry out the
procedure explained in the section "5.3 First commissioning" .
- Set the boiler to OFF
from REC10 selecting the STATE menu and
then BOILER.
a
1
TIME & DATE
TIME & DATE
:
17
b

Advertisement

Table of Contents
loading

Table of Contents