Commissioning; Preliminary Checks; Programming The Boiler - Beretta POWER EVO-X Series Installation Manual

Condensing high power boiler
Table of Contents

Advertisement

3 COMMISSIONING

Preliminary checks

3.1
The first ignition should be carried out by expert personnel from an
authorised Technical Assistance Service Centre.
Before starting up the boiler, check:
ƒ that the data of the supply networks (electricity, water, gas) cor-
respond to the label data
ƒ that the extraction pipes of the flue gases and the air suction
pipes are working correctly
ƒ that conditions for regular maintenance are guaranteed if the
boiler is placed inside or between items of furniture
ƒ the seal of the fuel adduction system
ƒ that the fuel flow rate corresponds to the values required for the
boiler
ƒ that the fuel supply system is sized to provide the correct flow
rate to the boiler, and that it has all the safety and control devic-
es required by current regulations
ƒ that the circulator rotates freely because, especially after long
periods of non-use, deposits and/or residue may hamper its free
movement (see paragraph "1.7 Manual circulator reset")
ƒ that there is water in the drain-trap (if not, fill it).
After a long period of non-use or following maintenance work, at the first
subsequent ignition (before starting up the appliance) it is vital to fill the
condensate collection drain-trap by pouring about 1 litre of water into the
boiler combustion analysis outlet and check:
- the safety disc is floating
- the water leaving the boiler via the discharge tube is running off
correctly
- the seal on the condensate discharge connection line is firm.
When the condensate discharge circuit (pipes and drain-trap) is
working properly, the condensate does not exceed the maximum
level (max). The preventive filling of the drain-trap, and the pres-
ence of the safety disc inside this element, aims to prevent the flue
gases from escaping into the room.
High efficiency mode
The boiler is equipped with an automatic function that is activated
at the first power supply or after 60 days of non-use (electrically
powered boiler). In this mode the boiler, for 60 minutes, limits the
heating power to a minimum and the maximum DHW temperature
to 55°C. Activating the chimney sweep temporarily disables this
function. The function is managed by parameter P7.08, which is set
by default to 0 (function not active).
During execution, the function is shown on the display with the
word HEM and, if P1.05 = 1, with the scrolling message "HIGH
EFFICIENCY MODE"

Programming the boiler

3.2
ƒ Turn the main system switch ON.
ƒ Open the gas tap to allow fuel to flow.
If necessary, the interface goes automatically to the clock menu.
The main page shows the icons
ENTER, and the first two digits of the clock (00:00) will be flashing
(0.5 sec ON, 0.5 sec OFF).
,
,
and
lit up, along with
To set the time and day, proceed as follows:
ƒ set the hour using the
button A
ƒ set the minutes using the
button A
ƒ set the day of the week using the
ment corresponding to the selected day will flash. Press the
MENU button in line with the
day setting. The clock will flash for 4 seconds, then the main
screen will be displayed again.
ƒ to quit the time programming function without saving the new
values, just press the
NOTE: the TIME and DAY settings can be modified at any time by ac-
cessing menu P1, parameter P1.02, or by pressing buttons A+C for at
least 2 seconds.
A
A
+
ƒ If the language needs to be set, select menu P1 and confirm
with
.
ƒ Use the arrows to visualise parameter P1.01, then enter the
sub-menu by pressing
ƒ Set the required language using the
"1.10 Structure menu". Confirm your choice by pressing
Every time the boiler is electrically powered, a venting cycle is run
(it lasts 6 min). The display shows the message -AIR and the RE-
SET icon lights up.
Press the RESET button to interrupt the venting cycle.
Turn the boiler OFF by pressing
36
and
arrows, then confirm with
and
arrows, then confirm with
and
arrows. The seg-
Enter
icon to confirm the time and
button.
+
RESET
MENU
.
and
buttons - see
.
C C
Enter
.

Advertisement

Table of Contents
loading

Table of Contents