Startup And Functioning; Preliminary Checks; Start-Up - Beretta Novella MAXIMA 129 N RAI Installation Manual

Boilers / cast iron base
Table of Contents

Advertisement

4

STARTUP AND FUNCTIONING

4.1

Preliminary checks

It is essential to perform the following checks
before starting up or testing the functioning of
the boiler. In particular:
- Check that the water and fuel shut-off cocks
are open.
- Check that the type and pressure of the gas
supply are as specified for the boiler.
- Check that the central heating circuit pres-
sure gauge shows a pressure of 1.5 bar with
the system cold. Check also that the circuit
is properly de-aerated.
- Check that all electrical connections to the
mains supply and to the system's control
and safety devices have been made cor-
rectly.
- Check that the flue is properly constructed.
4.2

Start-up

Once you have completed all the preparatory
steps, proceed as follows to start up the boil-
er for the first time.
- Turn the mains power switch ON (Fig. 4.1)
Fig. 4.1
- Set the room thermostat to the required
temperature (~ 20°C) or, if the system has
a timer or timer-thermostat, make sure that
this is switched "On" and adjusted to the
required temperature (~ 20°C) (Fig. 4.2)
Fig. 4.2
- Set the boiler control thermostat (5) to the
required temperature (Fig. 4.3)
5
Fig. 4.3
- Turn the boiler's control panel power switch
ON (I) (Fig. 4.4).
The boiler will now start up and the burner will
remain lit until the set temperature is reached.
Fig. 4.4