Ametek DR5200 Quick Start Manual page 29

Radar (fmcw) level transmitter for liquids in storage and process applications
Hide thumbs Also See for DR5200:
Table of Contents

Advertisement

INSTALLATION
2
Figure 2-36: Installation of the weather protection on a vertical signal converter
INFORMATION!
Install the weather protection after you connect the device to the power supply.
1 Put the weather protection clamp around the top of the device. Make sure that the locking nuts
on the clamp are aligned with the cable entries.
2 Attach the two locking nuts to the threads on the weather protection clamp. Tighten the lock-
ing nuts with a 10 mm socket wrench.
3 Lower the weather protection cover onto weather protection clamp until the hole for the lock
is in the slot at the front of the cover.
4 Put the R-clip into the hole at the front of the weather protection cover.
i
End of the procedure.
29
www.drexelbrook.com
DR5200
DR5200QS-LM, EDO#6-13-112 - Issue #3

Advertisement

Table of Contents
loading

Table of Contents