6. CHANGING POWER
SPECIFICATIONS
The equipment is shipped from the factory for use with 100 VAC line or 200 VAC line power.
The power specification of the 100 V line set can be changed to 200 VAC line; the 200 V
line set cannot. Below is the procedure for changing from 100 V line to 200 V line.
1. Remove the lower cover of the communication unit.
2. Remove the jumper connector J2 from the SWREG Board (16P0180).
3. Reassemble the communication unit.
Communication unit, lower cover removed
58
J2
J1
SWREG Board
16P0180
J3
TP6
R61
J5
J7
J9
TP7
J8
J4
J6
Need help?
Do you have a question about the FELCOM 82A Series and is the answer not in the manual?
Questions and answers