7.6 Install the first row of ILite tiles upon ILite rental feet

Ensure that the rental feet are correctly installed upon foot beams and leveled out before installing the rental
tiles. Do not forget the installation of the stacker feet in case the desired height of the LED-wall will be higher
than six (6) tiles.
How to install the first row of ILite tiles upon ILite rental feet ?
1. Place the first rental tile upon the rental feet at the most right side, seen from the rear, as illustrated. The positioning pins of the
rental foot must fit into the positioning holes at the bottom of the rental tile. Ensure that all latches (A), safety clamps (B) and row
levers (C) of the rental feet are in open position.
Image 7-16
2. Secure the rental tile by closing the two safety clamps (B), of the rental foot below the rental tile, as illustrated.
Note: The rental tile will slightly tilt to the rear, which is normal.
Image 7-17
3. Push the two latches (A), of the rental foot below, forward over the latch receivers of the rental tile as illustrated.