7. BASIC SETUP PROCEDURES

About this chapter
This chapter contains all installation procedures necessary to set up an ILite rental display. These procedures describe, with detailed
step by step actions and illustrations, how to install an ILite rental display in a floor mount or hanging configuration. Some of the
procedures are redundant either for a floor mount or for a hanging configuration. See chapter "Setup process of an ILite rental
display", page 31, to follow the correct order of procedures required to set up your ILite rental display in the configuration of your
choice.
Overview
Install an adjustable foot
Install the ILite rental feet without stacker foot
Install the ILite rental feet with stacker foot
Install the ILite rental foot alignment tool
Align and level the ILite rental feet
Install the first row of ILite tiles upon ILite rental feet
Install a row of ILite rental tiles into a base stand configuration
Install an ILite stacker profile
Install the ILite truss beam upon ILite rental tiles
Join two ILite truss beams together
Install a row of ILite rental tiles into a hanging configuration
Secure a hanging ILite rental display
R5976189 ILITE RENTAL DISPLAY 16/09/2005
7. Basic setup procedures
37