6. SETUP PROCESS OF AN ILITE RENTAL DISPLAY
About this chapter
This chapter describes roughly the installation process of the ILite rental display for a base stand (floor mount) or truss (hanging)
configuration. Several process stages refer to one or more of the detailed "Basic setup procedures", page 37.
Floor mount or hanging ILite rental display
The ILite rental tiles can be used in a floor mount or in a hanging rental configuration. These configurations are limited in height,
maximum 12 tiles high in case of a floor mount (base stand) configuration and maximum 15 tiles high in case of a hanging (truss)
configuration. Furthermore, a floor mount configuration requires a stacker system and ballast to ensure the stability of the display.
Overview
•
Set up a floor mounted ILite rental display
•
Set up a hanging ILite rental display
W
ARNING
Ensure you read, understand and follow all safety instructions mentioned in the chapter "Important safety
instructions", page 5, of this installation manual. Furthermore, be sure that all installation requirements for
your ILite rental display are fulfilled, see "Installation requirements for the ILite rental display", page 10.
R5976189 ILITE RENTAL DISPLAY 16/09/2005
:
Safety first. Fence off the installation area before starting to install your ILite rental display.
6. Setup process of an ILite rental display
31