Boiling Calibration; 6.6 Booster - Zip HydroTap G4 Boiling, chilled sparkling Command-Centre Installation Instructions Manual

Filtered boiling, chilled and sparkling drinking water for residential kitchens
Table of Contents

Advertisement

ON
OPEN Position
Stop cock
operation
OFF
CLOSED Position
6.4 - Boiling calibration (boiling models)
6.5 - Booster
Note failing to make the correct selection for the booster will affect product performance.
Note Depending on your location you may need to re-set the internal clock. See section G of the user guide
to check and if necessary, reset the date and time for your time zone.
802005UK - Residential (Boiling),chilled and sparkling installation instructions - Aug 2015 - v2.01
Commissioning
Press [START] / [STOP] button to start and stop the filter
flush.
Open the flush stop cock.
Allow at least 10 litres of water to flush through the filter.
Once the filter flush is finished, Close the stop cock then
press [STOP] to end filter flush mode.
Press [NEXT] for the boiling calibration screen.
G4 HydroTap Filter Flush Menu
• Press the [Calibrate] button and the system will
commence the boiling calibration procedure.
This will take approx 5-6 minutes.
• Upon completion, a booster reminder screen will
appear and allow you to return home by pressing
the [HOME] button.
• Check the date and time settings (see note
below).
Page 35 of 40

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the HydroTap G4 Boiling, chilled sparkling Command-Centre and is the answer not in the manual?

Questions and answers

Table of Contents