Verifying The Installation; Starting The Device - H3C MSR3610-X1 Installation Manual

Gigabit ethernet integrated service gateway
Hide thumbs Also See for MSR3610-X1:
Table of Contents

Advertisement

Figure 24 Connecting the DC power cord

Verifying the installation

Verify the following items before you power on the device:
There is enough space around the device for heat dissipation.
The interface modules are installed correctly.
The device, rack, and power source are reliably grounded.
The power source is as required by the device.
The device is connected correctly to the configuration terminal and other devices. The
configuration terminal is configured correctly and has been started.

Starting the device

WARNING!
Before powering on the device, locate the switch for the power source so that you can cut off power
promptly in case of an emergency.
To start the device:
Verify that the installation and configuration environment is as described in
1.
installation."
Power on the device.
2.
During the booting process, verify the following items:
3.
The LEDs on the front panel are in the states as described in
Table 7 LED states when the device is operating correctly
LED
PWR
SYS
State
Steady green
Flashing green slowly
21
Table
7.
Description
The power system is operating correctly.
The device system is operating correctly.
"Verifying the

Advertisement

Table of Contents
loading

Table of Contents