Pre-Installation Checklist - H3C MSR3610-X1 Installation Manual

Gigabit ethernet integrated service gateway
Hide thumbs Also See for MSR3610-X1:
Table of Contents

Advertisement

Figure 3 Installation accessories

Pre-installation checklist

Table 5 Pre-installation checklist
Item
Installation site
Requirements
Ventilation
With a hard disk: 5°C to 40°C (41°F to 104°F)
Temperature
Without a hard disk: 0°C to 45°C (32°F to 113°F).
Relative humidity
5% to 95% (noncondensing).
Cleanliness
ESD prevention
EMI prevention
A minimum clearance of 10 cm (3.9 in) is
reserved around the air inlet and outlet vents.
The installation site has a good ventilation
system.
Dust concentration ≤ 3 x 10
No visible dust on desk within three days.
The device and floor are reliably grounded.
Dust-proof measures are taken in the
equipment room.
Humidity and temperature are maintained at
the acceptable range.
An ESD wrist strap and ESD garment are
available.
An anti-static workbench and anti-static bags
are available.
Effective measures are taken for filtering
interference from the power grid.
The protection ground of the device is away
from the grounding facility of power equipment
or lightning protection grounding facility.
The device is far away from radio transmitting
stations, radar stations, and high-frequency
devices.
Electromagnetic shielding, for example,
shielded interface cables, is used as required.
5
Result
4
3
particles/m
.

Advertisement

Table of Contents
loading

Table of Contents