Verifying Installation - H3C VG 21-08 Installation Manual

Voice gateway
Table of Contents

Advertisement

Installation Manual
H3C VG 21-08 Voice Gateway
Caution:
Normally, the startup information is displayed on the terminal screen
after you power on the VG 21-08. For more information, see
section4.1.3 Startup Process".

3.8 Verifying Installation

Each time you power up the VG 21-08 during installation, verify
that:
Enough clearance has been reserved around the ventilation
openings of the device and the table/rack is stable enough.
Proper power supply is used.
The grounding cable has been correctly connected.
The VG 21-08 has been correctly connected to other
devices, such as a console terminal.
Caution:
Installation verification is extremely important, because operations of
the VG 21-08 depend on its stability, grounding, and power supply.
Chapter 3 Installing the VG 21-08
3-7

Advertisement

Table of Contents
loading

Table of Contents