Replacing Main Board - MUTOH ValueCut VC2-1800 Maintenance Manual

Cutting plotter
Table of Contents

Advertisement

Replacing Main Board

Please follow the steps below to replace the main board.
1.
The main board is installed at the right
end.
3. Remove the main board.
1:
Install the Main board in the reverse order of
removal.
2:
Need to remove the X-motor first to remove the
screws on the main board.
VC2E-MM-00
2. Remove the 5 cables and 4 screws.
32
MAINTENANCE MANUAL

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Valuecut vc2-1300Valuecut vc2-600

Table of Contents