Logging into the server

This topic details how to log into the server.
About this task
Procedure
1. If you are in a clustered configuration go to step 2. If you are in a stand-alone
2. If you are in a clustered configuration, perform the following steps:
96
IBM System Storage TS7600 with ProtecTIER: Installation Roadmap Guide
firewall. Each ProtecTIER server being used for replication must allow TCP
access through these ports.
about the customer's LAN and replication network, if applicable:
– External IP address
– External, fully-qualified, host name (hostname.domain.com)
– External default gateway address
– External network subnet mask
– Replication Port 1 IP address
– Replication Port 1 netmask
– Replication Port 1 host name (for example: jaguar_source_1)
– Replication Port 2 IP address
– Replication Port 2 netmask
– Replication Port 2 host name (for example: jaguar_source_2)
Note: Host names are case sensitive. Be aware of the use of upper- and
lowercase characters when gathering the information and when entering host
names into the system.
The above information can be found on the completed IP Address Worksheet,
located in the IBM System Storage TS7600 with ProtecTIER Introduction and
Planning Guide for the TS7650G (3958 DD4), IBM form number GC53–1152. A
blank copy of this worksheet is provided in this document for your convenience.
Refer to Appendix A, "Company information worksheet," on page 141.
connections" on page 87, to ensure that the Ethernet connections for the cluster
are configured correctly.
configuration, perform the following steps:
a. Connect the USB keyboard and monitor to the server.
b. Verify that the server is powered-on.
c. If it is, go to step 3 on page 97.
d. If it is not powered-on: power it on now, wait for the boot cycle to
complete, and then go to step 3 on page 97.
a. Verify that Server B (the top server) is powered-off.
v If it is powered-off, go to step 3 on page 97.
v If it is powered-on, power it off now. To do so:
– Connect the USB keyboard and monitor into the server, if necessary.
– At the server command line, enter the command:

Advertisement