Installing A Power Supply - Avaya Aura S8800 Maintaining

Server for sip enablement services
Hide thumbs Also See for Aura S8800:
Table of Contents

Advertisement

Replace FRUs
3. Press and hold the orange release tab to the left. See the following figure.
4. Pull the power supply part of the way out of the bay, then release the latch and
Next steps
Install a power supply.

Installing a power supply

About this task
Caution:
To remove all electrical current from the server, ensure that all power cords are disconnected
from the power source. The power control button on the server does not turn off the electrical
current supplied to the server. The server also might have more than one power cord.
Caution:
Never remove the cover on a power supply or any part that has the following label
attached.
32
Maintaining the Avaya S8800 Server for Avaya Aura
1
2
3
support the power supply as you pull it the rest of the way out of the bay.
Comments? infodev@avaya.com
Power supply release tab
Power supply filler
Power supply
®
SIP Enablement Services
November 2009

Advertisement

Table of Contents
loading

Table of Contents