3. Slide the cover toward the front of the server.
4. Make sure that the cover correctly engages all the inset tabs on the server.
5. Slide the server all the way into the rack until it latches.
6. Reconnect the external cables and power cords.
Replacing memory modules
Sequence for populating DIMM connectors
When you install dual in-line memory modules (DIMMs), install them in the sequence shown
in the following table to optimize system performance.
Maintaining the Avaya S8800 Server for Avaya Aura
Important:
Before you slide the cover forward, make sure that all the tabs on both the front,
back, and side of the cover engage the chassis correctly. If all the tabs do not
engage the chassis correctly, it will be very difficult to remove the cover later.
1
2
Cover
Tab
®
SIP Enablement Services
Replacing memory modules
November 2009
17