Festo CPX DE Series Manual page 84

Cpx-i/o modules for cpx terminal
Hide thumbs Also See for CPX DE Series:
Table of Contents

Advertisement

3. Overview and connecting technology I/O modules
1
Cut the cable to
length and remove
the coating. Push the
union nut and the
seal insert onto the
end of the cable.
2
Insert the ends of the
core into the ap
propriate slots of the
splicing ring.
3
Place the seal and
the splicing ring to
gether and cut off the
projecting core ends
flush with the splicing
ring.
4
Insert the pre−fitted
splicing seal element
into the contact sup
port in the sub−base.
Screw in the union
nut as far as possible.
Fig. 3/6: Connecting the cables to sub−base CPX−AB
3−18
Fitting
4
1
3
2
Dismantling
Loosen the screw connector and remove the cores by
·
pulling them out of the contacts.
The cores can be connected up to 10 times if the contact
ends are cut away each time (if the same core diameter is
used). Cut off the used cable ends and repeat steps 2 to 4.
Festo P.BE−CPX−EA−EN en 05602d
1
2
3
4

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents