Completing The Installation - Huawei Tecal RH5485 Installation And User Manual

Hide thumbs Also See for Tecal RH5485:
Table of Contents

Advertisement

Tecal RH5485 Server
Installation and User's Guide
12. Remove the heat sink from its package and rotate the heat-sink handle to the fully open
position.
13. Remove the cover from the bottom of the heat sink.
14. Position the heat sink above the microprocessor and align the clips of the heat sink with
the tabs next to the microprocessor socket.
15. Press on the top of the heat sink and rotate the lever to the closed position.
If you have other devices to install or remove, do so now. Otherwise, go to"Completing the
installation."

2.18 Completing the installation

To complete the installation, complete the following steps:
1. If you removed the front bezel, slide the bezel onto the front of the server chassis.
2. If you removed the top-cover bracket, reinstall it. Slide the blue latches into the locked
position.
3. Place the top cover over the top of the server.
4. Slide the top cover forward; then, press down on the cover handle until it clicks into
place.
5. Connect the cables and power cords to the rear of the server. For more information, see
"Connecting the cables."
Connecting the cables
The following illustration shows the locations of the input and output connectors on the rear
of the server.
Issue 02 (2011-05-25)
NOTE
Be sure to turn off the server before you connect any cables to or disconnect any cables from the
server.
Detailed cabling information is available in the Rack Installation Instructions that came with your
server or the Installation Instructions that came with any cable kits.
For additional cabling instructions, see the documentation that comes with the optional devices. It
might be easier for you to route any cables before you install certain optional devices.
Huawei Proprietary and Confidential
Copyright © Huawei Technologies Co., Ltd
2 Installing optional devices
2-49

Advertisement

Table of Contents
loading

Table of Contents