Installation And Connection; Control Cabinet Installation; Emc-Conform Installation - KEB COMBIVERT F5 Series Installation Manualline

E-housing
Hide thumbs Also See for COMBIVERT F5 Series:
Table of Contents

Advertisement

Installation and Connection

3.
Installation and Connection
3.1

Control Cabinet Installation

Protective system:
Operation temperature:
Storage temperature:
max. heat sink temperature:
Climatic category (EN 50178):
Relative humidity (without condensation):
Protect the COMBIVERT against aggressive gases and
aerosols !
3.2

EMC-conform Installation

1)
Always apply the shielding of motor and
control cables over a large contact
surface on both sides.
2)
Distance between control and power
cables at least 10..20 cm (4...8 inch).
3)
Lay motor and power cable separately.
4)
If it cannot be avoided, cross control
and power cables in a right angle.
5)
Install all cables as close as possible
to the mounting plate - ideal in a metal
cable duct.
6)
Mount COMBIVERT well conducting
with the mounting plate. Remove the
paint beforehand.
You can find further instructions regarding
the EMC-conform wiring in the Internet at
KEB.
Installation position and min. distances
-10...45 °C (14...113 °F)
-25...70 °C (-13...158 °F)
90 °C (194 °F)
max. 95 %
IP20
3K3
START
ENTER
FUNC.
F/R
SPEED
STOP
ANTRIEBSTECHNIK
1
5
1
10-20cm
2
3
4
90°
START
ENTER
FUNC.
F/R
SPEED
STOP
30 mm
1 inch
ANTRIEBSTECHNIK
6
5
35

Advertisement

Table of Contents
loading

Table of Contents