Creating A New Job In The Memory Or Copying A Job - EWM Tetrix 351 AC/DC Synergic FW Operating Instructions Manual

Hide thumbs Also See for Tetrix 351 AC/DC Synergic FW:
Table of Contents

Advertisement

Design and function
Organising welding tasks (Mode "JOB Manager")
5.5.2

Creating a new JOB in the memory or copying a JOB

Copying a pre-defined welding task from the fixed memory (JOBs 1 to 128) to the free memory
(JOBs 129-256):
It is normally possible to adjust all 256 JOBs individually. However, it is a good idea to assign
specific JOB numbers in the free memory (JOB 128 to 256) for specific welding tasks.
72
EXIT
Figure 5-63
099-000109-EW501
23.08.2018

Hide quick links:

Advertisement

Table of Contents
loading
Need help?

Need help?

Do you have a question about the Tetrix 351 AC/DC Synergic FW and is the answer not in the manual?

Table of Contents