Physically connecting the new server
Physical system protection requirements
To properly ventilate the system, you must provide a minimum clearance of:
• 63.5 cm (25 in) in front of the rack
• 76.2 cm (30 in) behind the rack
Note:
You must ensure that no environmental hazards, such as, excessive heat, excessive humidity,
improper ventilation, or electromagnetic interference from proximate equipment interfere with
the operation of the server.
Related links
Physically connecting the new server
Checklist for installing the server in the rack
This installation checklist contains the principle steps that are necessary to install the server in the
rack. The notation in the Reference column is a section in the appropriate HP document that
contains the step-by-step procedures. Where applicable, additional information and clarifications
appear in the Avaya recommendation column. Perform each task in the order specified.
Note:
Avaya customers are required to have a monitor and USB keyboard available for server
maintenance.
No.
Task
1
Observe safety
warnings.
2
Examine contents
of shipping
container (Avaya
provided
equipment).
3
Examine
installation
environment
(customer
August 2017
on page 26
on page 26
Reference
Avaya recommendation
User Guide:
Installing the
server into the
rack.
User Guide:
• Server
Identifying the
• Rail Kit
contents of the
server shipping
• Printed setup documentation
carton
• Rack mounting hardware kit and documentation
User Guide:
When installing the server in a rack, select a location that
Optimum
meets the environmental standards.
Environment
Installing the Avaya Equinox Streaming and Recording Server