ADS-tec OPC8017 Instruction Manual page 25

Industrial it, full hd
Table of Contents

Advertisement

25
OPC8017 OPC8024 / OPD8017 OPD8024
Figure 10: Tightening clamping blocks, step 3
 Then tighten all threaded pins to a torque of 0.5 Nm in the same sequence.
The pressure of the clamping block against the wall stabilises the OPC/OPD. Installation of the device
is complete when all clamping blocks are properly clamped.
© ads-tec Industrial IT GmbH • Heinrich-Hertz-Str. 1 • 72622 Nürtingen • Germany

Advertisement

Table of Contents
loading

This manual is also suitable for:

Opc8024Opd8017Opd8024

Table of Contents