Heating Connections; Requirements Heating Connections; Safety Device - iDM AERO ILM 2-7 Technical Documentation Installation Instructions

Modulation air-water-heat pumps for indoor installation, with navigator 2.0 control
Hide thumbs Also See for AERO ILM 2-7:
Table of Contents

Advertisement

6. 6. 6 Exterior installation
6. General description
General description
General description

6. Heating connections

6.1. Requirements heating connections

The pertinent laws, regulations and standards for
boiler house pipework and also for heat pump sys-
tems must be observed.
- Before the heatpump in the heating return a mag-
netic dirt trap must be installed.
- The safety and expansion devices for closed
heating systems pursuant to EN 12828 must be
provided.
- In case an electrical heating element will be installed
in the thermal storage tank, an additional safety de-
vice must be installed at the thermal storage tank!
- The line dimensioning must comply with the re-
- The connection hoses for heat pump inlet, return
connection hoses can be shortened to the desired
length, however, not shorter than 60 cm. Further-
more the connection hoses must not be bent!
- At the highest points of the connection lines venting
options must be provided, and at the lowest points
outlet options.
- In order to avoid energy losses the connection lines
must be insulated with suitable material.
ing with plastic pipes or open heating systems, corro-
sion may occur in the steel parts if steel pipes, steel
radiators or storage heating systems are used.
and lead to a capacity loss of the heat pump or high-
pressure disturbances.
Therefore avoid open heating systems or steel pipe
pump operation can cause damage!
46
-
-
Installation instructions AERO ILM
Heating water quality
European standard EN 12 828, ÖNORM H 5195 and
in particular VDI Guideline no. 2035-1 must be ob-
served and represent the latest technological stan-
must be taken into account. This is because 1 °dH
means 17 mg of lime per litre that can be separated.
For a heating system with 1,500 l of water content
lime at 20 °dH (in other words, half a kilogram). As the
lime deposits itself at the hottest and narrowest parts
in the system, this means that gas thermals, heat ex-
The plate exchanger for the hot water heating (espe-
hot gas heat exchanger in the HGL heat pump can
some circumstances.
For this reason,the heating water must be treated ac-
cording to the standards (softened/demineralised).
The pH value of the heating water should also be
checked;this should be between
8.2 and 9.5.
Hydraulic drain
For easier emptying a drain valve is installed before
the loading pump in the hydraulic piping.
The inspection and the preparation of the
heating water, belongs to the responsi-
bility of the competent heating engineer.

6.2. Safety device

When working with higher temperatures by a bivalent
have to be installed on sit
operation can cause damage!.