4.1. Cable and piping ducts
The hydraulic and electric connections can be ac-
complished on the left-hand side or on the right-hand
side.
nected as shown in the diagram and led through the
protective sleeve provided. The electric cables are
also connected as shown in the diagram.
4.2. Hydraulic connections to the heat pump
AERO ILM HGL
2 ... heat pump retur
(backside of HGL-condenser)
(C) IDM Energiesysteme GmbH
-
3
1
2
2 ... heat pump retur
Installation instructions AERO ILM
Connections and cable ducts
AERO ILM (without HGL)
4
1
2
19