Installation Plan - Optimum OPTIdrill RD 5 Operating Manual

Radial drilling machine
Table of Contents

Advertisement

which the machine is anchored must have sufficient load bearing capacity. In any case
commission a structural engineer who can check if the place of installation has
sufficient load bearing capacity. Please observe that there is tensile loading and
additional punctual load on the foundation while turning the cantilever against the
direction of the machine foot.
Check the horizontal orientation of the base of the drilling machine with a spirit level.
Check that the foundation has sufficient load-bearing capacity and rigidity.
Place the radial drilling machine on the provided underground.
Align the machine.
Fix the radial drilling machine in the provided through-holes on the machine foot.
3.6

Installation plan

Assembly
Version 1.0
2017-03-13
Original operating instructions
OPTIMUM
M A S C H I N E N - G E R M A N Y
RD5
GB
Page 29