Mounting; Preparing For Installation; Checking The Delivery - Siemens Sinamics Connect Series Operating Instructions Manual

Hide thumbs Also See for Sinamics Connect Series:
Table of Contents

Advertisement

Mounting

3.1

Preparing for installation

3.1.1

Checking the delivery

Procedure
1. When accepting a delivery, please check the packaging for visible transport damage.
2. If any transport damage is present at the time of delivery, lodge a complaint at the
shipping company in charge. Have the shipper confirm the transport damage
immediately.
3. Unpack the device at its installation location.
4. Keep the original packaging in case you have to transport the unit again.
5. Check the scope of delivery for completeness and intactness:
– One SINAMICS CONNECT device with one DC terminal block mounted
– Quick Install Guide in English
6. If the contents of the packaging are incomplete, damaged or do not match your order,
inform the responsible delivery service immediately.
SINAMICS CONNECT
Operating Instructions, 10/2018, A5E45421408
NOTICE
Damaged packaging of a device during transport and storage
A damaged packaging indicates that ambient conditions have already had a massive
impact on the device. If a device is transported or stored without packaging, shocks,
vibrations, pressure and moisture may impact the unprotected unit. This may cause
damage to the device.
• Do not dispose the original packaging.
• Pack the device during transportation and storage.
WARNING
Electric shock and fire hazard due to damaged device
A damaged device can be under hazardous voltage and trigger a fire in the machine or
plant. A damaged device has unpredictable properties and states. This may cause
death or serious injury.
• Make sure that the damaged device is not inadvertently installed and put into
operation.
• Label the damaged device and keep it locked away.
• Send off the device for immediate repair.
3
23

Advertisement

Table of Contents
loading

Table of Contents