2.0 INSTALLATION AND CONFIGURATION

2.1

PRE-STARTUP

Installing the WAG consists of:
Physically mounting the unit
Wiring the unit to power and connecting equipment
Configuring the unit
The rest of this section explains these steps.
2.2

HARDWARE INSTALLATION

This section explains installing the WAG and getting it ready to connect equipment.
2.2.1

Hardware Mounting

Using the mounting tab and holes on the back of the unit, the WAG can be mounted on a
standard 19" rack, or shelf, using standard relay rails. The mounting holes accept standard #10
mounting screws. After mounting, the unit needs to be wired to the power supply. The WAG may
also be wall-mounted.
2.2.2

Wiring

Wire power to the connector on the WAG as follows:
1. Remove the supplied plug from the J4 connector.
USE A FERRITE BEAD ON B AND N TO PREVENT POTENTIALLY
HARMFUL
EQUIPMENT.
2. Wire the connector by using Level 4 (NEMA) twisted pair for the TP LAN connector and 14 to
18 gauge wire for the battery connector. Make sure to properly use ferrite beads on the
power wires.
Document No.: COM-00-05-16
Version: C.1
SECTION 2
INSTALLATION AND CONFIGURATION
RF
EMISSIONS
2-1
INSTALLATION AND CONFIGURATION
WARNING
FROM
INTERFERING
June 2006, Revised June 2014
WITH
NEARBY

Advertisement

Table of Contents
loading

Table of Contents