Assignment Of The Socket X2B; Assignment Of The Terminal Block X2C - KEB COMBIVERT R6-S Instruction Manual

Power supply and regenerative unit
Hide thumbs Also See for COMBIVERT R6-S:
Table of Contents

Advertisement

Connection of the control board version S
6.5.2

Assignment of the socket X2B

RJ45 socket for phase synchronization
and temperature sensor
Figure 37:
The connection is made with a sync cable 1:1 with the socket X2B, X2C or X2D at the com-
mutation reactor or synchronisation unit.
6.5.3

Assignment of the terminal block X2C

Conductor cross-section 0.14...1.5 mm², tightening torque 0.22...0.25 Nm
PIN Function
24
Bridge between pin
24 and pin 25
25
26
not assigned
GB - 88
1
8
RJ45 socket
Description
Activation of the self-holding of the line contactor
-
No. Name
1
T1
Connection for temperature sen-
2
T2
sor (option)
3 U13_syn Synchronization phase 1 / 3
4
reserved
5 U21_syn Synchronization phase 2 / 1
6
reserved
7 U32_syn Synchronization phase 3 / 2
8
reserved
24 25 26
Function

Advertisement

Table of Contents
loading

This manual is also suitable for:

Combivert r6

Table of Contents