Technical Data
Exceeding of the max. rechargeable DC link capacity can lead to a defect.
A load removal in the DC link circle may be done only after the message „ready".
If the control release is set when switching off the mains, this can lead to an overcurrent error and the lifetime of
the module can be reduced.
The unit must be disconnected from the supply system or the load must be switched off in case of overcurrent or
overload.
5.1
Overload (OL) function
Release time [s]
270
250
200
150
100
60
105
Figure 21:
5.2
Operating conditions
Definition according to
Site altitude
Ambient conditions during operation
GB - 68
110
120
Overload (OL) function
Standard
EN 61800-2
EN 61800-5-1
130
140
Standard/
class
Inverter product standard:
rated specifications
Inverter product standard:
general safety
(with site altitudes over 1000 m a derating of
1 % per 100 m must be taken into considera-
Load
160
150
Instructions
max. 2000 m above sea level
tion)
further on next side