Operation 9-2 To Fit - Perkins 900 Series Workshop Manual

3 cylinder, naturally aspirated, and turbocharged diesel engines for agricultural and industrial use
Table of Contents

Advertisement

9
To fit
Special requirements
Consumable products
Description
POWERPART Threadlock (pipe)
1 Remove the covers from the pipes and manifolds.
2 Check that the turbocharger inlet and outlet are clean and free from restriction. Check that the turbocharger
shaft rotates freely. Also check that the openings in the manifolds and the exhaust pipe are clean and free from
restriction.
3 Fit a new joint (A5) to the exhaust manifold.
4 Lower the turbocharger into position on the exhaust manifold studs and fit the nuts (A6) above and below
the exhaust flange. Tighten the nuts to 22 Nm (16 lbf ft) 2,2 kgf m.
5 Put a suitable container under the turbocharger to contain the oil from the oil drain outlet of the turbocharger.
6 Fill the bearing housing of the turbocharger through the oil supply port with clean engine lubricating oil. Turn
the compressor wheel until oil comes out of the oil drain outlet. Clean the thread of the union connection (A2)
of the oil supply pipe (A1) and apply POWERPART Threadlock (pipe).
A
130
This document has been printed from SPI². Not for Resale
Part number
21820117 or
21820118
1
2
6 6
5
3
6 6
4
C0140B
Operation 9-2
Workshop Manual, TPD 1345E, issue 3
900 Series
Continued

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

CpCr

Table of Contents