Preparing The Sub-Base - Festo VIFB13-02 Series Manual

Valve terminal/valve sensor terminal with field bus connection, field bus protocol: profibus dp 12 mbaud
Table of Contents

Advertisement

VIFB13 - 02
Connections
for common
lines
(adhesive
foil)
Connection for common lines
Unilateral
Bilateral
Fig. 4/3: Connections on the sub-base
4-6
4. Installation

Preparing the sub-base

Connections for common lines are provided on
both sides of the sub-base. The common lines
can therefore be fitted on the left or the right,
depending on individual requirements. To increa-
se the air flow, we recommend that the lines for
compressed air supply and ventilation be con-
nected on both sides in the following cases:
when the valve terminal/valve sensor terminal
has more than 10 valves (rated supply pres-
sure 6 bar).
with large volume actuators
The connections should be made in accordance
with the table below.
5/3
1
3/5
Procedure
Remove all adhesive foils;
remove all blind plugs and fit on one side
Remove all Lupolen plugs and blind plugs
Connections
for common
lines (blind
plugs)
9701 NH

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents