VIFB13 - 02
4.3 INSTALLING THE ELECTRONIC COMPONENTS
4-16
4. Installation
WARNING
Before installation or maintenance work is
carried out the following must be switched off:
• the operating voltage for electronic
components and/or inputs
• the operating voltage for outputs
• the compressed air supply
The necessary pre-settings and the connections
to the electronic components are described in
this chapter. The following table (sections 1. ...4.)
summarizes the procedure.
1. Switching off
• Operating voltage
• Compressed air supply
2. Opening the field bus node
Configuring the valve terminal/valve sensor terminal
• Address selector
switch
• DIL switch
3. Closing the field bus node
Connecting the valve terminal/valve sensor terminal
• General
• 24V operating voltage connection
• Field bus interface (Connecting the interfaces
• Outputs
• Inputs
Checking the pre-settings and connections
4. Switching on
• Operating voltage
• Compressed air supply
(Setting the station number)
(Setting the station number,
protocol and self-test
(Connecting plugs, sockets)
and, if necessary,activating
the cable termination network
(Pin assignment)
(Pin assignment and circuitry)
(see Chapter 5)
0503a