To Wire An Equipment Touch To The Vvt Zone Ii - Carrier VVT Zone II Installation And Startup Manual

Table of Contents

Advertisement

To wire an Equipment Touch to the VVT Zone II

NOTES
The Equipment Touch requires a 24 Vac power supply. It is not powered by the Rnet.
If the Equipment Touch will be:
Daisy-chained on the Rnet with ZS sensors or a Wireless Adapter, use the standard 4-conductor Rnet
wiring and follow the wiring instructions To wire ZS sensors to the VVT Zone II (page 14).
The only device on the Rnet, you can use a 2-conductor cable instead of the standard 4-conductor Rnet
cable and follow the instructions below.
For complete Equipment Touch installation instructions including wiring diagrams, see the Equipment Touch
Installation and Setup Guide.
CAUTION The VVT Zone II can share a power supply with the Carrier controller as long as:
The power supply is AC power.
You maintain the same polarity.
You use the power source only for Carrier controllers.
1
Turn off the VVT Zone II's power.
2
Partially cut, then bend and pull off the outer jacket of the cable. Do not nick the inner insulation.
3
Strip about 0.25 inch (0.6 cm) of the inner insulation from each wire.
4
Wire the VVT Zone II's Rnet+ and Rnet- terminals to the terminals of the same name on the Equipment
Touch's connector.
NOTE If using shielded wire, connect the shield wire and the ground wire to the Gnd terminal.
5
Turn on the VVT Zone II's power.
6
Turn on the Equipment Touch.
VVT Zone II Controller
Installation and Start-up Guide
17
Installing the VVT Zone II
CARRIER CORPORATION ©2019
All rights reserved

Hide quick links:

Advertisement

Table of Contents
loading

This manual is also suitable for:

Vvt zone

Table of Contents