Beckman Coulter Avanti J-26S XPI Instructions For Use Manual page 56

High-performance centrifuge
Table of Contents

Advertisement

Operation
Setting Up an Elutriation Run
NOTE
At the end of the run, after disassembling the liquid and power lines, be sure to replace the black
rubber stoppers in the ports at the left side of the centrifuge door. Failure to seal these openings will
prevent proper operation of the FRS system, which will cause a diagnostic shut down during the
next run.
2-20
DELAY
1
ELUTRIATOR
1. Delay Control Knob
PN B10093AE

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents