1
Install the rotor.
2
Set up sample and buffer reservoirs and tubing lines as described in the rotor manual.
a.
Route tubing lines through the elutriator port holes at the left side of the door seal.
b. Close the centrifuge door.
3
Press
ROTOR
a. Press the
JE-5.0
4
Enter the remaining run parameters.
5
Press
ENTER
The rotor accelerates to set speed.
6
When the rotor reaches set speed, turn on the strobe controls by pressing the strobe control
power switch.
The power switch indicator lights.
7
When the rotor speed has stabilized, look through the port in the centrifuge door and turn the
control knob until the elutriation chamber in the rotor is synchronized with the strobe.
DELAY
• (The chamber will appear to be motionless).
• Sample can now be injected into the lines.
• See the elutriator rotor instruction manual for detailed instructions.
PN B10093AE
.
soft key.
JE
appears in the
field.
Rotor:
Rotor :
JE-5.0
Speed : 0
RPM
=
Time :
00:00
Temp :
25°C
Accel : MAX
Decel :
, then
.
START
1
DELAY
ELUTRIATOR
JA
0 x G
JS
JLA
Max Temp : 29°C
JV
JE
JCF-Z
1. Strobe Power Switch
Operation
Setting Up an Elutriation Run
2-19
2