General Instructions On Installation - Festo Compact Performance CPV Series Manual

Cpv valve terminal with direct link for the sds (smart distributed system)
Table of Contents

Advertisement

1. Installation
1.1

General instructions on installation

Festo P.BE−CP−SD8−...−EN en 0503b
Warning
Switch off the following power supplies before undertaking
installation or maintenance work:
S The compressed air supply
S The operating voltage for the bus interface/internal logic
S The operating voltage for the CPV valves
You will thereby avoid:
uncontrolled movements of loose tubing
undesired movements of the connected actuators
undefined switching states of the electronic components
Caution
The CPV valve terminal contains electrostatically vulner
able components.
S Do not therefore touch the contacts of the components
S Observe the regulations for handling electrostatically
vulnerable components.
You will thereby prevent damage to the electronic compo
nents.
1−3

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpv ge-sd-8 series

Table of Contents