1. Installation
1.2
Configuring the CPV valve terminal
1
Operating voltage
connection for
CPV valves
2
Diagnostic LED
3
Field bus/operat
ing voltage con
nection
4
Switch cover
5
Address selector
switches (station
no.)
6
DIL switch (mode
selection/baud
rate)
7
Displays of the
switching status
of the CPV valve
coils
Fig. 1/1: Connecting and display elements
1−4
The following connecting and display elements can be found
on the CPV valve terminal with Smart Distributed System:
1 2
12
12
12
12
14
14
14
14
3 4
7 8
6
9
5
0
4
1
3
2
7 8
6
9
5
0
4
1
3
2
12
12
12
12
14
14
14
14
7
Festo P.BE−CP−SD8−...−EN en 0503b
5
6