Connecting The Cpv Valve Terminal; Connecting Cable - Festo Compact Performance CPV Series Manual

Cpv valve terminal with direct link for the sds (smart distributed system)
Table of Contents

Advertisement

1. Installation
1.3

Connecting the CPV valve terminal

1.3.1 Connecting cable

Festo P.BE−CP−SD8−...−EN en 0503b
Field bus cable
Use a 4−wire cable for the field bus connection as speci
S
fied for your control system. The bus interface and the
internal logic of the CPV valve terminal are supplied with
power via the field bus cable.
Load voltage supply
Use a 2−wire cable for supplying the load voltage to the
S
CPV valve terminal. Screening is not necessary.
Please note
S You must refer to the PLC/IPC manual or the manual for
your bus interface in order to ascertain the type of field
bus cable which you should use. Take into account here
the distance and the baud rate.
S Select the appropriate cross−sectional area and observe
the voltage drop:
on the supply cable (field bus cable) for the bus
interface/internal logic and
on the supply cable for the CPV valves.
1−11

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpv ge-sd-8 series

Table of Contents