Basic Rules For Addressing - Festo Compact Performance CPV Series Manual

Cpv valve terminal with direct link for the sds (smart distributed system)
Table of Contents

Advertisement

2. Commissioning
2.2

Basic rules for addressing

2−8
A CPV valve terminal always occupies 16 outputs, irrespective
of the number of valve solenoid coils fitted. This enables the
CPV valve terminal to be extended at a later date without the
need to shift addresses.
The diagram below shows the addressing sequence of the indi
vidual CPV valve plates.
0−1
2−3
Fig. 2/4: Address assignment of a CPV valve terminal
4−5
8−9
6−7
10−11
Festo P.BE−CP−SD8−...−EN en 0503b
12−13
14−15

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpv ge-sd-8 series

Table of Contents