Festo Compact Performance CPV Series Manual page 25

Cpv valve terminal with direct link for the sds (smart distributed system)
Table of Contents

Advertisement

1. Installation
1
Cable
2
Housing
3
Connecting part
4
Strain relief
Fig. 1/7: Preparing the load voltage connection
Festo P.BE−CP−SD8−...−EN en 0503b
Preparing the load voltage connection
When you have selected suitable cables, connect them as
follows:
1. Loosen the centre knurled nut to open the socket.
1
2
3
2. Open the strain relief on the rear of the housing. Then
pass the cable through as described below.
3. Remove 5 mm of the insulation from the cable and fit end
sleeves to the wire strands.
4. Connect the ends of the conductors.
5. Replace the connecting part on the housing of the socket.
Pull the cable back so that it is not looped inside the
housing.
6. Tighten the strain relief.
4
1−13

Advertisement

Table of Contents
loading

This manual is also suitable for:

Cpv ge-sd-8 series

Table of Contents