6.2.2.3 Connecting Each Leaf Switch in Exalogic Machine Full Rack to Its
Spine Switch
Table 6-3
GW) to the spine switch (NM2-36P) in the Exalogic machine rack. The 3-meter cables
are bundled with the Exalogic machine. Only Exalogic machine full rack and half rack
configurations include a spine switch in U1. The spine switch is not connected by
default.
Table 6-3
in Exalogic Machine Full Rack
Cable Coming from
Slot (Exalogic
Machine)
R1-U26
R1-U26
R1-U26
R1-U26
R1-U24
R1-U24
R1-U24
R1-U24
R1-U23
R1-U23
R1-U23
R1-U23
R1-U16
R1-U16
R1-U16
R1-U16
Connecting an Exalogic Machine Full Rack and an Exadata Database Machine Full Rack
Note:
R2 in
Table 6-2
indicates an Exadata Database Machine full rack that is being
connected to an Exalogic machine full rack (R1).
lists the 3-meter cables that should be used to connect leaf switches (NM2-
Connect 3-Meter Cables from Each Leaf Switch to the Spine Switch
Port
0A
0B
1A
1B
0A
0B
1A
1B
0A
0B
1A
1B
0A
0B
1A
1B
Connecting to Slot
Port
(Exalogic Machine)
R1-U1
3A
R1-U1
3B
R1-U1
4A
R1-U1
4B
R1-U1
5A
R1-U1
5B
R1-U1
6A
R1-U1
6B
R1-U1
7A
R1-U1
7B
R1-U1
8A
R1-U1
8B
R1-U1
9A
R1-U1
9B
R1-U1
10A
R1-U1
10B
Chapter 6
Length
3 meter
3 meter
3 meter
3 meter
3 meter
3 meter
3 meter
3 meter
3 meter
3 meter
3 meter
3 meter
3 meter
3 meter
3 meter
3 meter
6-5