Planning detector lines
7
Planning an FDnet detector line
80 | 242
Building Technologies
Fire Safety
Verification
Verify the ↑ maximum current connection factor reserve by means of the diagram.
To do so, proceed as follows:
1. In the diagram for four loops, draw a vertical line at the address connection
factor AK = 18.
2. Draw a horizontal line in the intersection point with the 150 ohm curve.
3. Determine the maximum current connection factor reserve (MK_res). In this
example, it is 258.
4. Check whether the maximum current connection factor reserve (MK_res) is
higher than the calculated maximum current connection factor (MK). In this
example, the maximum current connection factor reserve (MK_res = 258) is
higher than the maximum current connection factor (MK = 200).
a The line may be operated in this way.
Exemplary diagram for a ↑ line card with four loops
MK_res
350
300
258
250
200
150
100
50
0
0
10
Figure 25: Example for the verification of the ↑ maximum current connection factor reserve (MK_res)
Information
The intersection point of AK and the resistance curve must be below the line
'MK_limit' (admissible range for the ↑ maximum current connection factor). Any
intersection points above that line are inadmissible.
If the maximum current connection factor reserve (MK_res) is lower than the
calculated maximum current connection factor (MK), the line must not be operated.
In that case, you will have to change the line assignment and calculate again.