Siemens FS20 Planning Manual page 172

Fire detection system
Table of Contents

Advertisement

Assembling the FC2080
12
Planning overview
2
Card cage (5 slots)
Module bus cards
9
Optional operating unit
Optional operating add-ons
172 | 242
Building Technologies
Fire Safety
Extension
Max. 2 can be mounted on carrier (19", card cage)
Max. 6 can be installed between processor unit and battery tray
Space for max. 37 module bus cards per FC2080
↑ Line card (FDnet/C-NET), max. 30
Line card (collective), max. 30
Line card (MS9i), max. 30
Line card (AnalogPLUS), max. 30
Line card (interactive), max. 30
Line card (interactive Ex), max. 30
I/O card (programmable), max. 37
I/O card (horn/monitored), max. 7, max. 1 per card cage
I/O card (remote transmission), max. 7, max. 1 per card cage
Indication and operation (optional)
Max. 1 operating unit can be installed
Max. 2 operating add-ons can be installed
Operating add-on (2 x LED) with 48 LED groups
Operating add-on (4 x LED) with 96 LED groups
008843_v_en_--
2015-12-15

Advertisement

Table of Contents
loading

Table of Contents