Task
3. LEC brings PRI to
• Project Engineer -
POD in building
• Project Manager -
4. Information for
Project Engineer -
PRI line obtained
program CODEC.
5. PRI wiring is ex-
Project Manager or
tended to the Hub
Install Team - Verify
room
Hospital wiring to the
Hub Room is correct.
6. Connect the PRI
• Connect the Hub to
to the Hub
• Verify IMUX light
7. Turn Up PRI Line Be present for testing
on site.
8. Test PRI Line
Make both outgoing
and incoming calls.
9.
Verify Line
Call 1(800) 222-7956 to
Registered with
verify.
ISDN provider
10. Ensure all PRI
Project Manger - pro-
information and
vide information to
analog line to hub
Technical Support
go into Stryker
Manager.
Install database
Stryker
Communications
• Verify POD is where
verify analog line
to hub functions by
• Obtain Circuit ID
performing a test call
to the Hub.
• Provide to Stryker
obtain PRI info and
provide to Project
Engineer.
Extend the Demarca-
tion to the Hub Room
using proper wiring.
the PRI line in hub
room.
comes up green.
Be present for testing to
provide access to Hub
room for LEC.
Register line if not
done.
Hospital Staff
Brings PRI to POD.
requested.
and switch specifics.
Project Manager.
Test line at POD and
Hub room.
Watch Switch Activity
and make any neces-
sary changes.
S
Telco
43
Need help?
Do you have a question about the Operating Room Information System and is the answer not in the manual?
Questions and answers