Iqube2® Junction Box; Iqube2 Junction Box Replacement - Rice Lake CLS-M Installation & Service Manual

Cargo lift scale
Hide thumbs Also See for CLS-M:
Table of Contents

Advertisement

7.0
iQube2
The iQube2 junction box designed for use with the Rice Lake CLS-M series forklift scales and is a replacement for the junction
box used on early models of the scale. Load cell connectors have been updated to improve serviceability.
7.1

iQube2 Junction Box Replacement

The junction box is located between the front and back panel of the scale and is covered by a metal cover plate on the top of the
scale.
Bolt and Washer Securing
Cover to Scale
Cover Plate
1. Turn scale power off on the Communication/Power box.
2. Remove the bolt that holds the cover plate in place, which conceals the junction box.
3. Remove the cover plate and set aside.
4. Unplug power cable.
5. Lift the forklift to a comfortable working height.
6. Remove the two screws securing the junction box to the scale, using a #4 metric Allen wrench, to remove existing
junction box from scale carriage.
7. Remove the coiled interface cable from the junction box.
8. Disconnect the load cell cables.
Steps 9-14 are only required when upgrading the original junction box to an iQube2. If replacing an iQube2 with
another iQube2 skip to step 15.
Note
Remove automotive quick connects from load cell cables.
Junction Box
®
Figure 7-1. Remove Cover Plate
© Rice Lake Weighing Systems ● All Rights Reserved
iQube2® Junction Box
65

Advertisement

Table of Contents
loading

Table of Contents