Routing the Load Cell Coiled Interface Cable

Do not plug the interface cable into the power/communication box until power hookup is completed.
CAUTION
1. With the cable connected to the junction box, route to the power/communication box from the forklift scale.
Routing of the cable depends on forklift style. The preferred route for a single stage forklift is through the center of the
mast, up the right front pillar, across the top of the overhead guard and down the right rear pillar to the
power/communication box.
2. Secure with cable ties at the scale, at the top of the mast and several other locations to keep it securely in place.
3. Slowly and carefully extend the mast to all positions to confirm that the cable is not pulled too tight and that there are
no pinch points along the way.
4. Check for proper signal cable clearance as the side shifter (if used), is moved back and forth.
5. After power hook-up is completed, plug the power connector into the power/communication box.
When routing cables, do not cover any existing labels on the forklift in compliance with OSHA regulations.
WARNING
www.RiceLake.com
18
Visit our website
Cable tie
Interface cable
Figure 3-11. Route Signal Cable