Mounting Power/Communication Box; Power/Communication Box (Pn 153616) - Rice Lake CLS-M Installation & Service Manual

Cargo lift scale
Hide thumbs Also See for CLS-M:
Table of Contents

Advertisement

3.2

Mounting Power/Communication Box

There are two styles of Power/Communication boxes, see below for the mounting instructions for the type that is being
mounted.
3.2.1

Power/Communication Box (PN 153616)

1. Hold the box against the selected location of forklift.
2. Adjust sliding plates so the bolt holes are clear of the forklift pillar. Maintain equal distances on each side of box.
3. Turn the box over and tighten the screws to secure plate in position.
Tighten screws
4. Align mounting bracket sliding plates to match sliding plates on the box. Ensure the bolt holes are aligned.
5. Turn mounting bracket assembly over and tighten the screws to secure position of the plates.
Right rear pillar
Sliding plate
Power/Communication
Figure 3-3. Slide Bracket Plates
Power/Communication
box mounting
Figure 3-4. Install Mount Bracket
Power/Communication Box Hardware Setup
Tighten screws
© Rice Lake Weighing Systems ● All Rights Reserved
Carriage bolts
13

Advertisement

Table of Contents
loading

Table of Contents