Powering The Power/Communication Box (Pn 153616); Weights And Measures Sealing - Rice Lake CLS-M Installation & Service Manual

Cargo lift scale
Hide thumbs Also See for CLS-M:
Table of Contents

Advertisement

3.4.1

Powering the Power/Communication Box (PN 153616)

The power/communication box contains the power supply board and the USB/Bluetooth communication board.
1. To turn the power/communication box on, push the On/Off switch on the side of the box. The switch will light when
power is on.
3.5

Weights and Measures Sealing

Weights and Measures personnel will inspect the junction box for proper sealing once installed on the forklift. The junction box
must have the proper serial tag affixed to the box and lead wire sealing on the junction box.
View from back of scale
Breather vent
On/Off switch
Figure 3-12. Power Switch of Power/Communication Box (PN 153616)
Weights and measures
sealing location
Figure 3-13. Sealing the Junction Box for Weights and Measures
Power/Communication Box Hardware Setup
Coiled interface cable
connection
Power cable
Weights and measure seals
© Rice Lake Weighing Systems ● All Rights Reserved
19

Advertisement

Table of Contents
loading

Table of Contents