Power/Communication Box Hardware Setup; Mounting Locations; Mounting Location #1; Mounting Location #2 - Rice Lake CLS-M Installation & Service Manual

Cargo lift scale
Hide thumbs Also See for CLS-M:
Table of Contents

Advertisement

CLS-M Installation/Service Manual
3.0

Power/Communication Box Hardware Setup

3.1

Mounting Locations

3.1.1

Mounting Location #1

The first preference for the mounting location of the box is 4-6'' from the top of the cage on the right rear pillar. If an access hole
is available in this location, route the power cable though the roll cage tubing to the battery.
If there is no access hole available on the right rear pillar, check for an access hole on the left rear pillar. If there is no access
hole available on the rear left pillar, use the closest available access hole on the forklift roll cage.
If unable to mount power/communication box in this location due to items such as fire extinguishers, use Mounting Location 2
as seen in
Figure
3-2.
3.1.2

Mounting Location #2

The alternate mounting location for the box is 4-6'' from the top of the cage on the left rear pillar. If an access hole is available in
this location, route the power cable though the roll cage tubing to the battery.
If there is no access hole available on the left rear pillar, check for an access hole on the right rear pillar. If there is no access
hole available on the right rear pillar, use the closest available access hole on the forklift roll cage.
www.RiceLake.com
12
Visit our website
Figure 3-1. Preferred Mounting Location
Alternate
location
Figure 3-2. Secondary Mounting Position
Preferred
location

Advertisement

Table of Contents
loading

Table of Contents